dr4qul4

Nu sunt expert, dar din ce am citit Tarnita devine rentabila doar cu Cernavoda 3+4. Si ar mai avea nevoie si de o centrala nucleara din Ungaria.
Iar Cernavoda 3+4 nu prea are sens fara tarnita, sau fara o alta Hidrocentrala de mare capacitate (care acum are sanse spre 0 sa fie facuta din cauza impactului asupra mediului).

Ce au facut ei pe Olt e doar asa..frectie la piciorul de lemn. Nu se poate macar apropia de randamentul pe care se mizeaza la Tarnita, iar curentul actual este destul de scump chiar si noaptea. Cu inca 2 reactoare, nu prea vom mai importa noaptea, ba din contra, ar trebui sa exportam...si nu prea avem cui.
Pariu cu Radu_A. 200 lei  (la API). El zice ca UMB pana la sfarsit de 2025 termina: A7 pana la Bacau, Dx6, A0 si DX12 T4. Eu sunt mai pesimist

Gendan

Din ce am văzut pe site la Transelectrica, in niciun punct conector cu Moldova nu e mișcare, nici macar pe la Vulcănești. Îmi amintesc că anul trecut, guvernul lor ar fi contractat ceva împrumut pentru sincronizarea rețelei lor cu a noastră. Cernavodă 3&4 ar fi o alternativă la Cuciurgan? Produce circa 2500 MW pentru 80% din necesarul lor.

thinker

#62
Nu se pune atata problema de rentabilitate. Tarnita sau alta capacitate trebuie sa fie rezerva, nu e vorba daca e profitabila, la fel ca centurile de siguranta si airbagul la autoturisme. Teoretic cu argumente economice putem demonstra cam orice, ca e profitabila sau ca nu e profitabila.

Ciunget din cate stiu nu e nici el prea profitabil. Ce faci daca e o oprire neplanificata la un reactor de la Cernavoda (au fost destule)  La -10% sistemul energetic intra instantaneu in colaps, poate suporta o variatie de 1-2% si pe termen scurt (cateva secunde). Si asta se lasa cu pagume imense. Atunci intra Ciunget, si alte capacitati la putere maxima sau in viitor Tarnita.

Asa e si cu panourile solarele- intra soarele in nori, e o zi noroasa sau se opreste brusc vantul. Pana pornesc centralelel pe carbune si ating capacitatea dureaza ziel intregi si atunci intervine pe cateva ore sau zile hidro si compenseaza. Desigur ca hidro si produce profitabil curent, un procent importanta, care e si cel mai ieftin de catre dispunem.
Infrastructura de transport e sistemul prin care circula sangele unei tari. Romania are prea multe cangrene, prea multe artere lipsa.

dr4qul4

Orice investitie trebuie sa fie rentabila ca de aia facem studiu de fezabilitate . Dar nu neaparat in sensul de profit ci in cost de oportunitate (cat ma costa daca nu o fac)
Iar rentabilitatea asta se poate ajusta din pix: subventie de la stat, taxe pe energie pt echilibrare sau chiar ceilalți producatori ar putea fi obligati sa-si vanda curentul extra catre Tarnita la un pret derizoriu si atunci cand au nevoie, sa il cumpere la preturi de zeci de ori mai mari.
Momentan este mult mai ieftin sa faca acest schimb cu alte tari, chiar daca si acum ajungem la fluctuatii f mari de la o ora la alta.
Sau ne vor mai pune inca o taxa ca sa nu ne taie curentul in orele de varf de consum
Pariu cu Radu_A. 200 lei  (la API). El zice ca UMB pana la sfarsit de 2025 termina: A7 pana la Bacau, Dx6, A0 si DX12 T4. Eu sunt mai pesimist

thinker

In DE pe perioada sarbatorilor de iarna, fiindca nu au consumatori si nu pot opri capacitati, plateau consumatorilor energia consumata. De asta nu se pune problema de profit cand e vorba de echilibrarea sistemului. E o nevoie vitala.

Cat despre importuri, capacitatea maxima technica e de 2300MW si am importat deja la 1900MW, deci nu mai e asa mult spatiu de joaca. Problema e daca construim retele de import sau lacuri de acumulare- e vorba de politica energetica. Ideal ar fi sa facem ambele.
Infrastructura de transport e sistemul prin care circula sangele unei tari. Romania are prea multe cangrene, prea multe artere lipsa.

Dagda

#65
Anul asta castigam Premiul Nobel si pentru fizica si pentru chimie!!

Ministrul Energiei: vrem să acumulăm energie electrică în depozitele de gaze, o idee în premieră în lume

http://www.economica.net/ministrul-energiei-vrem-sa-acumulam-energie-electrica-in-depozitele-de-gaze-o-idee-in-premiera-in-lume_164766.html

Ionut

Distribuitorii de energie şi-au propus investiţii de 1,6 miliarde lei în 2019

Cei opt operatori de distribuţie a energiei electrice concesionari în România şi-au propus ca în anul 2019 să deruleze investiţii totale de 1,6 miliarde lei, anunţă Autoritatea Naţională de Reglementare în Domeniul Energiei (ANRE). Acest efort investiţional va ţinti, în proporţie de 90%, reţeaua electrică de distribuţie, în care se vor realiza lucrări de retehnologizare constând în înlocuirea echipamentelor uzate fizic şi moral, lucrări pentru reducerea pierderilor proprii tehnologice şi îmbunatăţirea calităţii serviciului, precum şi lucrări pentru extinderea de reţea. Un segment semnificativ din investiţii este dedicat implementării de sisteme de măsurare inteligentă, pentru care operatorii au alocat o valoare totală de cca. 75 milioane lei, ceea ce reprezintă un procent de 6% din valoarea investiţiilor programate în anul 2019.

Detalii in Adevarul

cristi5

https://quillette.com/2019/02/27/why-renewables-cant-save-the-planet/

Firmele de oil&gas promoveaza wind&solar ca sa loveasca in nuclear. E clar ca la densitatea de energie wind&solar sunt foarte slabe.

Harry

Electricity - production: This entry is the annual electricity generated expressed in kilowatt-hours. The discrepancy between the amount of electricity generated and/or imported and the amount consumed and/or exported is accounted for as loss in transmission and distribution. Electricity - production field listing
61.78 billion kWh (2016 est.)
country comparison to the world: 47
Electricity - consumption: This entry consists of total electricity generated annually plus imports and minus exports, expressed in kilowatt-hours. The discrepancy between the amount of electricity generated and/or imported and the amount consumed and/or exported is accounted for as loss in transmission and distribution. Electricity - consumption field listing
49.64 billion kWh (2016 est.)
country comparison to the world: 49
Electricity - exports: This entry is the total exported electricity in kilowatt-hours. Electricity - exports field listing
11.22 billion kWh (2015 est.)
country comparison to the world: 18
Electricity - imports: This entry is the total imported electricity in kilowatt-hours. Electricity - imports field listing
4.177 billion kWh (2016 est.)
country comparison to the world: 45
Electricity - installed generating capacity: This entry is the total capacity of currently installed generators, expressed in kilowatts (kW), to produce electricity. A 10-kilowatt (kW) generator will produce 10 kilowatt hours (kWh) of electricity, if it runs continuously for one hour. Electricity - installed generating capacity field listing
23.94 million kW (2016 est.)
country comparison to the world: 38
Electricity - from fossil fuels: This entry measures the capacity of plants that generate electricity by burning fossil fuels (such as coal, petroleum products, and natural gas), expressed as a share of the country's total generating capacity. Electricity - from fossil fuels field listing
47% of total installed capacity (2016 est.)
country comparison to the world: 156
Electricity - from nuclear fuels: This entry measures the capacity of plants that generate electricity through radioactive decay of nuclear fuel, expressed as a share of the country's total generating capacity. Electricity - from nuclear fuels field listing
6% of total installed capacity (2017 est.)
country comparison to the world: 20
Electricity - from hydroelectric plants: This entry measures the capacity of plants that generate electricity by water-driven turbines, expressed as a share of the country's total generating capacity. Electricity - from hydroelectric plants field listing
29% of total installed capacity (2017 est.)
country comparison to the world: 70
Electricity - from other renewable sources: This entry measures the capacity of plants that generate electricity by using renewable energy sources other than hydroelectric (including, for example, wind, waves, solar, and geothermal), expressed as a share of the country's total generating capacity. Electricity - from other renewable sources field listing
19% of total installed capacity (2017 est.)
country comparison to the world: 45

sursa: CIA  :whistling: :cool:

Ionut

O multinaţională vrea să se retragă din România/ Europa de Est, ,,călcâiul lui Ahile" pentru acţionari

Grupul CEZ, cu o capitalizare de 11 mld. euro şi controlat de statul ceh, intenţionează să-şi vândă afacerile din România, autorităţile fiind deja informate de intenţia cehilor în contextul în care vor avea discuţii cu un oficial al companiei în următoarea perioadă, informează Ziarul Financiar. Acţionarii CEZ s-au arătăt nemulţumiţi de strategia companiei din zona Europei de Est şi au apreciat, în cadrul unei adunări generale, că managementul companiei nu poate asigura profitabilitatea pe termen lung în România, Albania, Bulgaria sau Turcia, arată ZF, care citează surse din piaţă. În 2017 CEZ a lansat procedura de vânzare a activelor din Bulgaria. În ultimii ani, pe piaţa românească de energie au existat mai multe informaţii cu privire la vânzări ale unor operaţiuni ale grupurilor străine, tranzacţii care însă nu s-au materializat.

Mediafax

Ionut

RAPORT: Energia regenerabilă accelerează către o eră fără subvenţii

Sectorul energiei regenerabile intră, la nivel global, într-o nouă fază de dezvoltare fără subvenţii, potrivit unui raport EY, iar China continentală şi SUA rămân pe primele două locuri în clasamentul celor mai atractive 40 de pieţe din lume pentru investiţii în energie regenerabilă. "România poate reveni pe harta marilor investitori în energie regenerabilă odată cu creşterea competitivităţii noilor echipamente, ca urmare a scăderii rapide a costurilor de producţie şi instalare la nivel global", a spus un manager din cadrul EY România, Mihai Draghici. Având în vedere că energia regenerabilă devine un sector din ce în ce mai nesubvenţionat, în care proiectele concurează pe piaţă în funcţie de avantajele economice şi ecologice, specialiştii analizează două caracteristici conexe ale acestui nou peisaj: modul în care proiectele se adaptează la noul context marcat de preţurile de vânzare a energiei şi la dezechilibrele pieţei (riscul comercial), precum şi rolul tot mai important al cumpărătorilor de energie în subscrierea proiectelor de energie verde.

Detalii pe News.ro

perfidus

Instalarea panourilor solare/fotovoltaice se poate face fără autorizație de construire

QuoteInstalarea panourilor se face fără autorizație de construire începând cu data de 27 iunie. Persoanele interesate să-și monteze panouri fotovoltaice nu mai sunt nevoite să cheltuie bani și să piardă timp pentru obținerea autorizației de construire. Astfel, s-a eliminat obligativitatea deținerii unei astfel de autorizații.

Potrivit noilor prevederi legale, montarea panourilor fotovoltaice pentru producerea de energie electrică și/sau panouri solare pentru încălzirea apei este permisă fără ca proprietarul clădirii să obţină autorizaţia de construire, însă primăriile trebuie anunţate referitor la modificările aduse locuinţei, înaintea începerii lucrărilor.

Modificarea actului normativ a fost inițiată de Administrația Fondului pentru Mediu pentru a debloca Programul privind instalarea sistemelor de panouri fotovoltaice pentru producerea de energie electrică, în vederea acoperirii necesarului de consum și livrării surplusului în rețeaua națională și Programul privind instalarea de sisteme fotovoltaice pentru gospodăriile izolate neracordate la rețeaua de distribuție a energiei electrice.

Sursa: GdS

Autostrada Pitesti - Craiova (A12) e ingropata. Se prefigureaza Drumul Expres CrPit (DEx12).; Contract semnat Tr.1 12.2018 - Tirrena Scavi ; Tr.2/L1&L2 finalizat - Spedition UMB ; Semnare contract Tr.3 si Tr.4 16.09.2020  - Spedition UMB ; Licitația pentru ,,Centura de ocolire Craiova Varianta Sud DN 56- DN 55- DN 6" - contract semnat 14.01.2022 - Rizzani de Eccher; "Constructia Variantei de Ocolire Targu Jiu – Finalizare Lucrari" - contract semnat 22.09.2020 - S.E.C.O.L. - stadiu lucrari 60%; "Reabilitare DN 6, Alexandria – Craiova, Lot 2: km 132+435 – km 185+230 – Relicitare" - contract semnat in 08.03.2022 - Ozaltin Inșaat

kitsune

Chiar aștept să se deblocheze programul, vara asta am în plan să instalez. S-a publicat lista aia cu firmele care fac parte din program?
Natural stupidity is much more dangerous than artificial intelligence

perfidus

Nope.

https://www.afm.ro/sisteme_fotovoltaice.php

Doar atat scrie:
LISTA INSTALATORILOR VALIDATI VA FI PUBLICATA INAINTEA DEMARARII PROGRAMULUI PENTRU PERSOANELE FIZICE
Autostrada Pitesti - Craiova (A12) e ingropata. Se prefigureaza Drumul Expres CrPit (DEx12).; Contract semnat Tr.1 12.2018 - Tirrena Scavi ; Tr.2/L1&L2 finalizat - Spedition UMB ; Semnare contract Tr.3 si Tr.4 16.09.2020  - Spedition UMB ; Licitația pentru ,,Centura de ocolire Craiova Varianta Sud DN 56- DN 55- DN 6" - contract semnat 14.01.2022 - Rizzani de Eccher; "Constructia Variantei de Ocolire Targu Jiu – Finalizare Lucrari" - contract semnat 22.09.2020 - S.E.C.O.L. - stadiu lucrari 60%; "Reabilitare DN 6, Alexandria – Craiova, Lot 2: km 132+435 – km 185+230 – Relicitare" - contract semnat in 08.03.2022 - Ozaltin Inșaat

kitsune

Mulțumesc. Măcar de s-ar publica într-o lună, cât mă mai dau cu barca, poate apuc să aplic vara asta, pentru instalare nu e nevoie de prezența mea fizică, pentru actăraie da. Da' tare mi-e că distribuitorul meu de energie o să fie contra, că "nu există posibilitatea tehnică". Știu că trebuie un acord de la ei (sau de la furnizor). Prin februarie am întrebat la furnizor, habar nu aveau.