Infrastructura de metrou a vecinilor Romaniei

Started by Ionut, November 24, 2016, 08:57:28 AM

Previous topic - Next topic

0 Members and 2 Guests are viewing this topic.

cezar-mario2012

 Sofia - Bulgaria, linia 3 de metrou:

Depoul Zemliane:



... și ca fapt divers, depoul are deja chiriași  :D



Primul tronson al liniei 3 de metrou va fi dat în exploatare anul viitor.

Ionut

Metrovagonmash va moderniza trenuri pentru metroul din Sofia



La inceputul lunii decembrie, metroul din Sofia si Metrovagonmash au semnat un contract pentru reparatii si modernizarea a opt vagoane (doua trenuri a cate patru vagoane) cu optiunea pentru modernizarea a 40 de vagoane suplimentare. In cadrul contractului, Metrovagonmash va dezvolta proiectele tehnice detaliate pentru reparatia si modernizarea trenurilor de metrou. Vagoanele modernizate vor fi livrate in 2019.

In 2013, Metrowagonmash si metroul din Sofia au semnat un contract pentru livrarea a 10 trenuri de metrou Rusich (30 de vagoane), toate fiind livrate in acelasi an. Vagoanele sunt dotate cu sistemul asincron de tractiune Hitachi. Metrovagonmash si metroul din Sofia colaboreaza din 1998. In prezent, parcul de metrouri al Sofiei este format din 150 de vagoane furnizate de compania ruseasca. Toate aceste vehicule sunt produse la fabrica companiei Metrovagonmash.

ClubFeroviar.ro

Ionut

Reteaua de metrou din Sofia va fi extinsa

Ministrul Transporturilor din Bulgaria, Rosen Jeliazkov, a anuntat ca in urmatorul exercitiu financiar, fondurile europene din cadrul Programului Operational ,,Transport si Infrastructura de Transport" vor fi folosite pentru constructia a doua extensii ale retelei de metrou care vor conecta partea centrala a Sofiei de cartierele Levski si Slatina. Dupa 2020, Bulgaria va aloca 500 de milioane de euro pentru proiectele de dezvoltare a retelei de metrou. Prima extensie prevede constructia a 6 statii de metrou noi de la Shipka catre Tsarigradsko Shose Blvd. la Spitalul Universitar Sfanta Ana. A doua extensie include constructia a 3 statii de metrou noi si va ajunte in cartierul Levski.

In prezent, Sofia lucreaza la Linia 3 de metrou care va furniza o legatura est-vest. Aceasta va avea 18 km cu 19 statii, iar lungimea totala a retelei de metrou a Sofiei va creste la 56 de km de linii si 53 de statii pana in 2020. Linia 3 va fi deservita de 20 de trenuri Inspiro, iar contractul include o optiune pentru alte 10 trenuri de metrou.

In iunie, Banca Europeana de Investitii a anuntat ca evalueaza a doua etapa a proiectului Liniei 3 pentru care intentioneaza sa aloce 22 de milioane de euro. Aceste fonduri acordate de BEI ar putea fi utilizate pentru a acoperi un cost total de 50 de milioane de euro. Proiectul include o linie de metrou dubla de aprox. 3,8 km cu 4 statii si o statie de cale ferata pentru legatura cu reteaua feroviara nationala la ultima statie de metrou. Costul total al proiectului este de 500 de milioane de euro din care 350 de milioane de euro sunt fonduri UE. 70% din finantarea proiectului este asigurata de UE in cadrul Programului Operational ,,Transport si Infrastructura de Transport", iar 30% sunt fonduri locale. Proiectul este implementat in doua faze. Lucrarile la prima faza a Liniei 3 au fost lansate in 2016 si includ constructia unei sectiuni de 8 km cu 8 statii care vor intra in serviciu in 2019, cand 20 de metrouri vor circula pe linie. Contractul pentru lucrarile de constructie a fost acordat consortiului format din Doğuş, Via Construct si Ultrastroy.

ClubFeroviar.ro

cezar-mario2012

Sofia - Bulgaria
5 New Metro Stations to Be Released by October



By the beginning of October, the first 5 stations of the third subway beam linking ''Graf Ignatiev'' Str and ''Krasno Selo'' district will be launched, Stoyan Bratoev, the executive director of Metropolitan Metropolitan, announced on BNT.

The other two sections of the beam will be completed by the end of the year.

Eng. Stoyan Bratoev, Executive Director "Metropolitan": In its final version, the line will serve almost 200,000 passengers daily. More than 11,000 tonnes of harmful substances will be less discharged into the atmosphere per day.

https://www.novinite.com/articles/195135/5+New+Metro+Stations+to+Be+Released+by+October

cezar-mario2012

The Construction of the Metro to Slatina District and Simeonovski Lift Starts in 2021



The construction of a route through "Slatina" and "Geo Milev", as well as the connection of "Mladost 4" and Simeonovski lift are the next steps towards the extension of the Sofia metro in the coming years. This is part of the General Plan of Sofia, which is to be voted by the Sofia Municipal Council, reports money.bg

According to plans, the construction of the six-station line through the Slatina and Geo Milev districts and the Arena Armeec to Tsarigradsko shosse could start in 2021. The other branch is on the first line of the subway from the Business Park to Simeonovski lift, wrote "24 hours". It includes a 2 km long line and 2 metro stations. In this way a connection of "Mladost 4" to Vitosha will be provided.

It is clear from the calculations that about 50,000 passengers will travel daily through the line to Slatina and another 26,000 in the second branch. "We are already preparing the project for the extension of the third line through Slatina, except for it under the Operational Program" Transport "we have also provided financing for the extension of the line from" Vladimir Vazov "boulevard to Levski G with 3 km of track and 3 metro stations "pointed out the head of" Metropolitan "Prof. Stoyan Bratoev. The line to Slatina will take 4 years to complete it, and for Levski G 3 years.

https://www.novinite.com/articles/195447/The+Construction+of+the+Metro+to+Slatina+District+and+Simeonovski+Lift+Starts+in+2021

cezar-mario2012

Mayor of Sofia: 8 Metro Stations from the Third Line to be Ready by the End of the Year



We expect 8 metro stations, 8 km from the third underground line, to be ready by the end of the year, Sofia Mayor Yordanka Fandakova told bTV.

"Today, the tunnel boring machine will complete its work, we expect this to happen by noon. That means that we are almost at the finish line, 88% of the first stage of the metro is ready. The machine has dug a 7 km two-way tunnel from Krasno selo to Little City Theatre Off The Channel," she explained. "We expect 8 metro stations, 8 km from the third line, to be ready by the end of the year. The second stage, 4 km from Ovcha kupel, to the Gorna Banya Ring Road, should be ready by the middle of next year," Fandakova said. She further said that the third underground line is a very complicated and difficult project but also the most important one for the city. "We are building very fast, we have built 30 km out of a total of 40 in 10 years, and now we are going to launch 12 km, which are being built separately," said the mayor, adding that the municipality has planned 16 larger projects for this year.

https://www.novinite.com/articles/195479/Mayor+of+Sofia%3A+8+Metro+Stations+from+the+Third+Line+to+be+Ready+by+the+End+of+the+Year


Ionut

Sofia comanda mai multe trenuri de metrou Inspiro



Siemens Mobility a anuntat ca Metroul din Sofia a comandat ale zece trenuri de metrou Inspiro cu trei vagoane care vor fi produse in colaborare cu Newag. In total, Sofia a comandat 30 de trenuri de metrou Inspiro care vor fi coloana vertebrala a mobilitatii viitoare a orasului care va beneficia de capacitate imbunatatita. In 2015, Metroul din Sofia a acordat o comanda companiei Siemens pentru furnizarea a 20 de trenuri de metrou. Comanda includea si o optiune pentru 10 trenuri suplimentare.

Platforma Inspiro a fost dezvoltata punandu-se accent pe consumul redus de energie, optimizarea intretinerii, facilitarea accesului persoanelor cu dizabilitati si grija fata de mediul inconjurator. La finalul ciclului de viata, materialul rulant poate fi reciclat in proportie de pana la 95%. Cabina mecanicului si spatiul dedicat pasagerilor sunt dotate cu aer conditionat pentru un plus de confort. Designul placut, luminos al spatiului de interior creeaza o atmosfera de siguranta si garanteaza o calatorie confortabila. Trenurile cu trei vagoane sunt produse in colaborare cu partenerul Newag si vor fi utilizate pe noua Linie 3 care va furniza o legatura de 18 km pe axa est-vest din Sofia care va rula atat la suprafata, cat si in subteran si care va deservi 18 statii. Trenurile vor intra in circulatie incepand cu 2019.

ClubFeroviar.ro


Ionut

STRABAG se va ocupa cu modernizarea zonei de sud a metroului M3 din Budapesta

Grupul european de construcții STRABAG, prin intermediul filialei sale maghiare STRABAG Építőipari Zrt., a câștigat contractul de reabilitare a secțiunii sudice a liniei de metrou M3 din Budapesta. Valoarea contractului este de 24,7 miliarde HUF (~ 76 milioane EUR). În plus față de modernizarea a 5 stații și zone ale călătorilor, structura liniilor este, de asemenea, modernizată. Lucrările trebuie finalizate în 2020.

"După modernizarea secțiunii nordice începând din 2017, suntem încântați că putem continua să contribuim la modernizarea rețelei de metrou din Ungaria cu secțiunea sudică", spune Thomas Birtel, CEO al STRABAG SE. Proiectul general este împărțit în trei secțiuni: Nord (Újpest-Központ – Lehel tér), Orientul Mijlociu (Lehel tér -Nagyvárad tér) și Sud (Nagyvárad tér – Kőbánya-Kispest). Linia de metrou are o lungime de 17,3 km, cu 15,5 km de cale ferată în tunel. Procesul de atribuire al secției de mijloc este încă în așteptare.

Mobilitate.eu

Ionut

Sofia a început testele la Linia 3 de metrou



Primarul Sofiei, Yordanka Fandakova, a participat la testarea noilor trenuri de metrou Inspiro pe Linia 3 a orasului care va fi inaugurata pana la sfarsitul acestui an. Serviciile initiale includ cinci statii noi pe linia de 8 km Krasno Selo- Vladimir Vazov, in partea de est a orasului. Alte trei statii de metrou din Krasno Selo pana in cartierul Ovcha Koupel vor fi puse in operare in prima jumatate a lui 2020. Linia 3 a metroului din Sofia va avea 18 km si va fi o legatura pe axa est-vest, deservind 18 statii atat in subteran, cat si la suprafata. In plus, incepand cu 2021, lucrarile de constructii vor fi lansate pentru o alta extensie a Liniei 3 in partea de est a orasului, deservind cartierele Levski, Slatina si Geo Milev.

Linia va fi deservita de noile trenuri Inspiro livrate de consortiul Siemens-Newag in cadrul unui contract semnat in 2015. Contractul in valoare de 140 de milioane de euro a inclus livrarea a 20 de trenuri Inspiro, alaturi de alte 10 trenuri de metrou Inspiro cu trei vagoane, o optiune exercitata in februarie 2019. In total, Sofia a comandat 30 de trenuri de metrou Inspiro cu o platforma care pune accent pe consumul redus de energie, optimizarea mentenantei, atentia fata de persoanele cu dizabilitati si protejarea mediului. In iunie 2018, Sofia a primit primul tren de metrou.

ClubFeroviar.ro


cezar-mario2012

#42


Linia 3 de metrou din Sofia, Bulgaria în probe.

Prezentare:







... mai multe poze aici.

https://www.skyscrapercity.com/showpost.php?p=163204386&postcount=17456

cezar-mario2012

 Refacere carosabil în zona stații de metrou Krasno Selo (Sofia linia 3), odată cu construcția noi lini s-a optat și pentru realizarea unui pasaj subteran auto: