Autostrada A6 București-Lugoj

Started by Ionut, July 19, 2013, 09:15:14 PM

Previous topic - Next topic

0 Members and 3 Guests are viewing this topic.

oneLess

S-a mai mișcat ceva cu variantele de traseu pe A6 DTS-Filiași ?
Văd că s-a desenat pe harta API o variantă ...





Xrailer

#1861
Pana si cei din propaganda de partid il numesc Dex Lugoj-Craiova, dar vor sa faca Autostrada Craiova-Calafat :o unde nu e trafic deloc. 


https://imgur.com/a/sHmlNQI

oneLess

#1862
^ Fițuica aia de când este ? 5 ..10 ani, maxim 15 !? Click bait electoral, mulțumim!

Xrailer

Azi primita in cutia postala, propaganda pentru 9 iunie 2024.

oneLess

DEx cu Tg.Jiu a început de 2 ani. Nu urmează...

Xrailer

Cum am zis nici ei nu stiu ce scriu.

gruia88

Oricum cine citeste acele aberatii electorale , o sa creada ca la Craiova o sa vina toate companiile mari in urmatorul an si o sa devenim pol Industrial , pol It , Nod Rutier important in tranzitul de marfa si o sa mute laserul de la Magurele in Padure la Buvocat!

Dar da ma conving pe zi ce trece ca orice propaganda electorala , stire din presa si declaratii sunt departe de adevar!

A si venit sotia la mine zilele trecute , ai auzit ca gata mai deschide Umbrarescu ceva pe DeX12 , si am zis stai putin ca te bag in istorie acum , procente , utilaje , mobilizare, prioritizare, etc ... deci mai simplu am raspuns ca nu e chiar atat de simplu :) si probabil nu o sa deschida .

oneLess

^ Ai uitat de cel mai al doilea aeroport!

a.l.x

Quote[Breaking News🗞]
At the end of last week, The Romanian National Road Infrastructure Company - C.N.A.I.R. S.A. has approved the Multicriteria Analysis – Stage 1 (AMC 1), part of the Feasibility Study for Drobeta Turnu Severin – Domașnea High-Speed Road.🛣 
The construction of the high-speed road Drobeta Turnu Severin - Domasnea, with a length of approximately 65 km, will lead to traffic decongestion on DN 6 and will provide a new traffic corridor through the southern area of Romania that will connect the south-eastern part of the country with the western part, respectively the Pan European Corridor IV, currently under construction. At the same time, an easy connection will be created with the bridge over Danube at Calafat.🌉 
"This construction will lead to fast and reliable travel over long distances as well as on commuter relationships, by reducing travel time and increasing average travel speed. It will also improve the road traffic safety conditions and will reduce the vehicle operating costs, minimizing, at the same time, the negative impact on the environment, as well as the negative impact on the population and human settlements. In our analysis we also considered the investment efficiency and sustainability, achieving expected operational results with minimal capital costs and justified maintenance and operating costs." Alexandru Prodan, Project Manager Egis in Romania.
The project is co-financed from Transport Operational Programme (POT) 2021-2027, and in AMC 1 there were identified 4 possible route variants. The next stage of the feasibility study is to be Multicriteria Analysis – Stage 2 (AMC 2). 🚘
#engineering #egis #Romania

Postare Egis

Mulțumim CNAIR pentru informare! :)

tom_sawyer

DMV FILIASI - DROBETA TURNU SEVERIN

IN DATA DE 15.05.2024 A FOST AVIZATA ANALIZA MULTICRITERIALA A VARIANTELOR DE TRASEU ETAPA 2.

sursa: harta CESTRIN

gruia88

Asta mai concret ce inseamna , auzisem ca s-ar fi ales o varianta de traseu dar pe harta tot apar cele 2 galben si albastru , s-au decis la una pana la urma?

tom_sawyer

Da, înseamnă că s-a ales varianta finală de traseu (dintre cele două).

gruia88

Dar nu au anuntat efectiv care , adica gen s-au hotarat la o varianta si probabil mai au ceva lucururi de clarificat dupa care vine anuntul oficial ?

a.l.x

Am primit un răspuns de la CNAIR la început de Iunie, dar nu l-am mai postat:

Pentru Filiași-DTS s-a ales cum era de așteptat varianta Galbenă la nivel de AUTOSTRADĂ.
Pentru DTS-Domașnea se analizează în AMC2 variantele 2 și 3,aici sper să fie trasate greșit traseele pe cestrin.

CESTRIN:

Filiași-DTS:
QuoteAU FOST APROBATE TEMELE DE PROIECTARE PENTRU INVESTIGATIILE ARHEOLOGICE SI STUDIILE TOPOGRAFIE.
IN PERIOADA URMATOARE VOR FI DEMARATE INVESTIGATIILE DE TEREN.

DTS-Domașnea:
QuoteIN CURS DE FINALIZARE ANALIZA MULTICRITERIALA ETAPA2.

Domașnea-Caransebeș:
QuoteAU FOST EMISE OBSERVATII.
IN DATA DE 02.08.2024 A FOST TRANSMISA AMC1 SI INANINTATA SPRE PROGRAMARE IN SEDINTA CTE CNAIR S.A.

Caransebeș-Lugoj:
Nu s-a anunțat câștigătorul pe 15 Iulie, mai așteptăm...

Ionut

Ar fi culmea prostiei să faci autostradă Craiova-Filiași-DTS și apoi să ai DX între DTS și Domașnea până la Lugoj... știu, munte.

Dar poți avea profil de A cu viteză de proiectare mai mică pentru optimizare costuri. Este coridor principal trafic greu, e importantă declivitatea de A și lățimea benzii de 3.75m.