News:

Unboxing Coradia Stream în depoul Alstom!
API admisă în structura partenerială pentru dezbaterile pe Politica de Coeziune post-2027!

Main Menu

Autostrada A6 București-Lugoj

Started by Ionut, July 19, 2013, 09:15:14 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

oneLess

S-a mai mișcat ceva cu variantele de traseu pe A6 DTS-Filiași ?
Văd că s-a desenat pe harta API o variantă ...





Xrailer

#1861
Pana si cei din propaganda de partid il numesc Dex Lugoj-Craiova, dar vor sa faca Autostrada Craiova-Calafat :o unde nu e trafic deloc. 


https://imgur.com/a/sHmlNQI

oneLess

#1862
^ Fițuica aia de când este ? 5 ..10 ani, maxim 15 !? Click bait electoral, mulțumim!

Xrailer

Azi primita in cutia postala, propaganda pentru 9 iunie 2024.

oneLess

DEx cu Tg.Jiu a început de 2 ani. Nu urmează...

Xrailer

Cum am zis nici ei nu stiu ce scriu.

gruia88

Oricum cine citeste acele aberatii electorale , o sa creada ca la Craiova o sa vina toate companiile mari in urmatorul an si o sa devenim pol Industrial , pol It , Nod Rutier important in tranzitul de marfa si o sa mute laserul de la Magurele in Padure la Buvocat!

Dar da ma conving pe zi ce trece ca orice propaganda electorala , stire din presa si declaratii sunt departe de adevar!

A si venit sotia la mine zilele trecute , ai auzit ca gata mai deschide Umbrarescu ceva pe DeX12 , si am zis stai putin ca te bag in istorie acum , procente , utilaje , mobilizare, prioritizare, etc ... deci mai simplu am raspuns ca nu e chiar atat de simplu :) si probabil nu o sa deschida .

oneLess

^ Ai uitat de cel mai al doilea aeroport!

a.l.x

Quote[Breaking News🗞]
At the end of last week, The Romanian National Road Infrastructure Company - C.N.A.I.R. S.A. has approved the Multicriteria Analysis – Stage 1 (AMC 1), part of the Feasibility Study for Drobeta Turnu Severin – Domașnea High-Speed Road.🛣 
The construction of the high-speed road Drobeta Turnu Severin - Domasnea, with a length of approximately 65 km, will lead to traffic decongestion on DN 6 and will provide a new traffic corridor through the southern area of Romania that will connect the south-eastern part of the country with the western part, respectively the Pan European Corridor IV, currently under construction. At the same time, an easy connection will be created with the bridge over Danube at Calafat.🌉 
"This construction will lead to fast and reliable travel over long distances as well as on commuter relationships, by reducing travel time and increasing average travel speed. It will also improve the road traffic safety conditions and will reduce the vehicle operating costs, minimizing, at the same time, the negative impact on the environment, as well as the negative impact on the population and human settlements. In our analysis we also considered the investment efficiency and sustainability, achieving expected operational results with minimal capital costs and justified maintenance and operating costs." Alexandru Prodan, Project Manager Egis in Romania.
The project is co-financed from Transport Operational Programme (POT) 2021-2027, and in AMC 1 there were identified 4 possible route variants. The next stage of the feasibility study is to be Multicriteria Analysis – Stage 2 (AMC 2). 🚘
#engineering #egis #Romania

Postare Egis

Mulțumim CNAIR pentru informare! :)