News:

API te vrea în echipa din București!

Main Menu

Drumurile vecinilor Romaniei

Started by Cristi232, May 07, 2012, 03:49:55 PM

Previous topic - Next topic

0 Members and 2 Guests are viewing this topic.

cezar-mario2012

  Info Bulgaria: Alunecare de teren pe drumul I-1(E79) ,, Traficul pe drumul I-1 Vratsa - Montana în zona Montana dintre intersecția  cu sens giratoriu a drumului II-81-Montana - Lom și intersecția cu bypass Montana rămâne limitată. (...) Pentru tranzitul în direcția către Vidin - Vratsa se poate folosi bypass Montana."





Din comunicatul www.api.bg știrea pe larg aici: http://www.api.bg/bg/prescentar/novini/ekipi-na-api-i-geozashita-pleven-izvrshiha-ogled-na-svlachisheto-na-pt-i-1-montana-vraca/

Poze de pe SSC Bulgaria:









Nu este vorba de centura noua a orașului Montana, ci de vechiul drum.

TibiV

Noi macar am demolat de buna-voie... :D
Mama proștilor este mereu gravidă... :)

dr4qul4

Pentru ca tot s-au plans unii ca s-au inchis cateva drumuri pe viscol la noi si ca nu suntem in stare sa deszapezim, pun 2 poze din Bulgaria. Este de la acelasi viscol! Asta e intoarcerea de la Bansko.

Persoana de la care le am mi-a spus (avea si un copil mic in masina): "Bine ca eram cu Santa Fe-ul ca altfel pe acolo ramaneam. Erau foarte multe masini oprite. Nu inteleg de ce ce dracu nu au inchis drumul. Macar la noi nu te lasa sa pleci cand e viscol".






De remarcat ca in prima poza ninsoarea se cam oprise, dar cam lipseau masinile de deszapezire.
Cocoase inutile care ne vor afecta zeci de ani:
1. Focsani 2. Boita 3. Balcauti
"multe multumiri" proiectantilor
2. Pariu cu hefaistos: 200 lei: UMB nu deschide nimic (min 9 km, chiar si HP)  pe A7 înainte de 15 iunie 2024

cezar-mario2012

 Veste proasta de la bulgari, vor sa anuleze atribuirea loturilor 1 și 2 din A2 Hemus secțiunea Yablanits-Plevna/Lovech.  Declarația Primului Ministru Boiko Borisov postă pe facebook:

  ,, Am comandat Ministrului Dezvoltarii Regionale Liliana Pavlova şi NCSIP să întreruptă imediat procedura pentru selectarea antreprenorilor pentru construirea a două loturi din autostrada  Hemus . Sunt acțiunile întreprinse în ceea ce privește lotul 1 și 2."

Sursa: https://www.facebook.com/boyko.borissov.7?fref=nf

Tavi

^Ai idee de ce a dispus acesta masura?

cezar-mario2012

 Corupție...constructorii s-ar fi înțeles intre ei, așa s-a scris prin ziare.

cezar-mario2012

  Motivele oficiale ale anulării contractării loturilor 1 și 2 din A2 Hemus secțiunea Yablanitsa-Lovech/Plevna:  lipsa fondurilor, comunicat NCSIP  http://ncsip.bg/en/index.php?id=14

  ,, NCSIP has terminated the procedure for appointment of contractors for the construction of Lot 1 and Lot 2 of the Hemus Motorway

National Company Strategic Infrastructure Projects has terminated the procedure for appointment of contractors for the construction of Lot 1 and Lot 2 of the Hemus Motorway with decision No ОП-32-РШ-007 / 15.02.2016 due to impossibility for financing to be ensured under Operational Programme ,,Transport and Transport Infrastructure" 2014-2020 (OPTTI).
The budget of OPTTI under Priority axis 2 ,,Development of road infrastructure along the ,,core" Trans-European transport network" is at the total amount of 673 million euro. The funds are designated for the construction of Struma Motorway Lot 3.1 from Blagoevgrad to Krupnik for the amount of 83,6 million euro including VAT, the Zheleznitsa tunnel at with indicative value of 120 million euro including VAT, Lot 3.2 – section Krupnik – Kresna, for which a decision for the alignment and its value are to be determined, Lot 3.3 from Kresna to Sandanski for the amount of 128,2 million euro including VAT, as well as for the implementation of phase 2 of the Western part of the Sofia Ring Road for the amount of 63,2 million euro including VAT.
According to the preliminary estimates the implementation of the stated projects will fully engage the available funding for road projects under Priority axis 2 of the OPTTI."

  Ceva mai mult de atât: ww.novinite.com http://www.novinite.com/articles/173114/Bulgaria+Cites+Suspected+Foul+Play%2C+Lack+of+Money+in+Calling+off+Motorway+Tender

  ,,Bulgaria Cites Suspected Foul Play, Lack of Money in Calling off Motorway Tender

Bulgaria Cites Suspected Foul Play, Lack of Money in Calling off Motorway Tender
Bulgaria has terminated the process for the selection of a contractor for the construction of part of Hemus motorway due to lack of EU funding, the Regional Development Ministry said on Monday afternoon.

It is impossible to secure funding for the construction of Lot 1 and Lot 2 of Hemus motorway under Operational Programme Transport and Transport Infrastructure 2014-2020, the Regional Development Ministry said in a statement. 

Bulgaria is set to spend a total of EUR 673 M under that operational programme for the construction of sections of Struma motorway linking Sofia with the border with Greece as well as the building of the western section of Sofia outer ring road, according to the statement.

Preliminary estimates have shown that the implementation of those projects will absorb the entire EU funding available under the operational programme, the Regional Development Ministry added.

Prime Minister Boyko Borisov had ordered the cancellation of the selection process, the government press office announced on Monday morning without citing a reason for the decision.

The tender for the construction of two sections of the motorway with combined length of 60 km in central northern Bulgaria at a cost of BGN 800 M (EUR 400 M) had been won by firms which Bulgarian media reports had linked to controversial MP and media tycoon Delyan Peevski and the head of Lukoil Bulgaria, Valentin Zlatev.

One Italian and one Turkish company, who had offered lower prices, had appealed the results of the tender before the country's anti-trust watchdog, the Commission for Protection of Competition.

Several hours after the Regional Development Ministry released its statement, Borisov told reporters in Prague, the Czech Republic, that he had ordered that a new tender were held, in order to dispel doubts of foul play among the public.

"Officially or unofficially, there have been doubts that the procedure wasn't OK. Yet, it was conducted absolutely lawfully. But when doubts circulate in the public space about a deal that will cost 800 million levs of state money, I will never allow to remain the slightest tinge of doubt that I have done something wrong," Borisov told reporters, according to dnevnik.bg.

"That's why I closed the procedure and ordered that a new tender were held, before the eyes of all media," Borisov added.

He also said that money will be available for the construction of the two lots of the motorway once a new tender was held.

Asked whether the winning companies could sue the Bulgarian government for the cancellation of the tender, Borisov replied: "That's the reason why we have no money today - officially, but we'll have from tomorrow on", according to dnevnik.bg."





cezar-mario2012

 Pasajul Filipovtsy de pe Centura de Vest a Sofiei:





Și ceva interesant folosit la acest pasaj:








cezar-mario2012

  Se lucrează la A0 (Tangenta de Nord a Sofiei) secțiunea lipsă dar nu cu avântul de anul trecut, bine nici condițiile nu sunt chiar bune.








florin74


cezar-mario2012

#1825
  Situația din defileul Kresna este un pic mai complicată. Articolul este plătit de opozanți proiectului. Soluția propusă are impact minim, aceasta este de upgradare a actualului drum național, corecți de traseu și tuneluri. Am fost pe acolo și cine a mai fost, știe zona, nu este cine știe ce defileu, Valea Oltului sau a Jiului sunt mult mai deosebite.  Viteză proiectată pentru autostrada din defileu Kresna este de 80-100km/h. Zonă este seismică, numai anul trecut au fost câteva cutremure de patru grade, iar munți conțin uraniu, nu cred ca cineva ar vrea să treacă printr-un tunel iradiant.  Drumul există și acum, ce o să-l închidă cineva ca să ocrotească Natura2000, și pe unde să mai meargă în Grecia? Sunt trei grupuri de interese: ecologiști - ei nu vor autostradă pe acolo; cei care vor tunelul de 15 km din mândrie, acești sunt un grup mai mare format din profesori universitari, arhitecți, proiectanți și constructori, dar și o parte importanță a publicului; și statul care vrea varianta cea mai ieftină și mai rapidă de a se construii. UE nu dă 1miliard de euro pentru tunel, ce scrie în articol este vrăjeală, această sumă este pentru toate proiectele din Bulgaria pe exercițiul 2014-2020. Teamă unora că dacă se face autostradă pleacă toți tineri în UK, este o altă prostie, dacă e să plece oricum pleacă, cu sau fără autostradă. Vai nu mai poate să trecă ursul, broască țestoasă sau fluturi dintr-o parte în altă. Chiar așa, și acum pe unde trec o iau înot și trec DN-ul ? Nenorocire dacă se face autostradă nu mai sunt buni struguri pentru vin. Hai ca mă umflă râsul. Asocierea viticultorilor din zonă vor autostradă, au făcut și o hartă turistică ce o oferă gratuit celor intresati, aceasta prezintă traseul podgoriilor și obiectivele turistice importante din zona. Zonă viticolo este după Sandarsky până la graniță cu Grecia, deci în zonă în care există deja autostradă.

danutzu_1069

@Cezar
Foarte interesanta bordura cu rigola. Nu am mai vazut assa ceva.
Dar din pacate la noi s-ar colmata imediat cu noroi si ... gunoaie

cezar-mario2012

#1827
  Lucrările la  pasajul Filipovtsi de pe Centura de Vest a Sofiei au avansat destul de bine, dacă mai prind vreme mai buna în doua săptămâni îl termină. Stadiul este următorul: drum de acces și rampă pe parte cu cartierul Lyulin sunt deja asfaltate, trotuarele sunt în mare parte finalizate; pasajul este finalizat mai trebuie pusă hidroizolația și asfaltat, de finalizat trotuare plus elementele de siguranță; pe parte dinspre Filipovtsi rampa este pregătită pentru asfaltare, aripioarele de acces în CVS sunt asfaltate și mare parte din trotuare sunt deja finalizate. Între timp s-a trecut la reabilitare benzilor adiacente și a spațiului median din CVS.

Drum acces dinspre oraș, cartierul Lyulin:



Rampa dinspre Lyulin:



Pasajul peste CVS:



Rampa dinspre Filipovtsi:



  Drumurile de acces dinspre Filipovtsi către CVS:






Pasajul:



Reabilitarea benzilor adiacente și zona mediana a CVS:





Lucrările la acest pasaj au început pe 23 noiembrie 2015, au prins Crăciunul, Anul Nou și două reprize de ninsoare. Poze preluate de pe SSC Bulgaria.

cezar-mario2012

 Au reînceput să turezee motoarele pe Tangenta de Nord a Sofiei, prinzând episodul cu temperaturi de peste 20 grade s-au apucat de asfaltat pe unele secțiuni pregătite de dinainte, au reînceput înălțarea terasamentelor și a zidurilor de sprijin.













Bulgarii de pe SSC Bulgaria estimează ca data a finalizări  integrale a A0 (Tangenta Nord) 31 martie 2016, vom vedea, acum depinde și de vreme. Poze preluate de pe SSC Bulgaria.

cezar-mario2012

  Mai știți surpările de teren de pe pe drumul I-1(E79) zona orașului Montana:



Bulgarii s-au apucat de reparații:







Poze preluate de pe SSC Bulgaria.